logo



Jack-Up Drilling Rig

Reference ID: 5007

Price On Request

For Sale

equipment details

category

-

Drilling Rigs > Offshore Rigs

Model/Type

-

Marathon LeTourneau Class 84 Jack up

Brand

-

Marathon LeTourneau

model Year

-

Unknown

Condition

-

Refurbished

description:

Jack-Up Drilling Rig 300 Ft Water Depth for sale - Manufactured by Marathon LeTourneau and fully Refurbished and Overhauled in 2018 - Design: Marathon LeTourneau Class 84 Jack-Up - Status: Active, ABS Class Certification - Last Inspection: (ABS) January 2019 - Legs: 3 x 410 ft Square Truss - Cantilever: Slot dimensions 41 ft x 50 ft - Helideck: S-61; diameter 70 ft - Water Depth: 300 ft (17 ft - 300 ft) - Maximum Drilling Depth: 20.000 ft with 5 Inch DP - Available length below hull including 5 ft margin Air Gap: 80 ft - Jacking and skidding system: Marathon LeTourneau AC electric rack and pinion, 90 ft/HR - Derrick: Dreco 170 ft x 30 ft x 30 ft x 1.500.000 lbs. - Cantilever Load: 1.310.000 lbs. - Drawworks: 1320 x UE 2000HP National Oilwell; wire 1 ½”. Electric brake: model 7838 Baylor - Rotary Table: model C-375 National Oilwell 37 ½", driven by 1 D79 EMD motor - Top Drive: model TDS-4H Varco BJ 650 TON, with Pipe Handler model PH-85 - Travelling: Continental Emsco 760H 650 TON - Crown Block: National OilWell 760FA - Mud Pumps: 2 National Oilwell modelo 12-P-160 Triplex - 5000 psi. Stand pipe 5 in x 5000 psi - Main Power: 3 EMD 16-645-E8 Engines 6600 HP, generators AB20-N6 x 1,575 kW 600 V - Emergency Power: 1 Cat 3412-TA 719 HP Diesel engine - Cementing Unit: 2 electric triplex pumps. 15000 PSI, 14 BPM - Control System: air/electric powered - Choke and Kill Manifold: 3-1/16" x 10000 psi x 2 HCR & 2 manual - Accommodations: 88 berths; main offices, auxiliary offices; mess and galley, meeting room; recreation room and gym, medical office with observation room and bedroom with eight beds for quarantine cases - Cranes: Model PC-120AS Marathon Letourneau; Boom: 2 @ 120’ Max. load 90000 lbs - Model PC-120AS Marathon Letourneau; Boom: 1 @ 100’ Max. load 90000 lbs - Major maintenance and upgrades of all major equipment and security and navigation systems; replacement of structural steel, replacement of HVAC systems, updating of SCR and MCC electrical systems, toxic and combustible gas detection systems, fire detection system, boats and liferafts, general alarm and fire alarm systems, telecommunications and GMDSS systems, major maintenance and replacement of main drilling equipment including BOP and BOP control unit, new electrical cementing unit to 15000 PSI, 14 BPM @ 22 LPG and new solids control equipment. Complying with international standards and ABS class certification regulations for MODU equipment - Contact: info@rigfinder.com for all details and price.

seller contact details:

+971-50-8477254

REPLY TO THIS AD